 |
 |
|
|
|
|
|
|
|
 |
|
|
|
Links to other great websites
|
 |
|
 |
|
|
 |
|
 |
|
|
|
|
|
 |
 |
|
|
|
"Shovel Ready" Stimulus Package requested by our mayors
|
 |
|
 |
Projects in Arizona
Below are the "shovel-ready" projects for which the mayors of this state have requested federal stimulus funding. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not. For a more local view, you can drill down to projects in a particular city. Just choose a city from the following list.
The total of cost of all the projects submitted by Arizona is $5,574,053,222
View a specific city in Arizona: Avondale • Bullhead City • Casa Grande • El Mirage • Flagstaff • Gilbert • Goodyear • Kingman • Lake Havasu City • Mesa • Peoria • Phoenix • Sahuarita • Scottsdale • South Tucson • St. Johns • Tombstone • Tucson • Yuma
|
Description
|
City
|
State
|
Jobs
|
Cost
|
Program Type
|
Vote Ratio
|
|
Van Buren St: Avondale Blvd to 99th Avenue - Add 2 lanes
|
Avondale
|
AZ
|
160
|
$8,075,000
|
Streets/Roads
|
-15
|
|
Dysart Road: Harrison Street to Lower Buckeye Road - Construct a new 4-lane roadway
|
Avondale
|
AZ
|
100
|
$4,600,000
|
Streets/Roads
|
-9
|
|
Clean up on 4th Street
|
Avondale
|
AZ
|
200
|
$3,000,000
|
Streets/Roads
|
-31
|
|
Central Avenue: Western to Van Buren – Mill and Overlay
|
Avondale
|
AZ
|
65
|
$2,300,000
|
Streets/Roads
|
-6
|
|
Avondale Blvd: Thomas to McDowell Rd - Add 2 through lanes
|
Avondale
|
AZ
|
90
|
$1,500,000
|
Streets/Roads
|
-2
|
|
127th Avenue: Lower Buckeye rd to Dysart (Las Ligas District) - Add Sidewalk, street lighting & landscaping, also red-existing street
|
Avondale
|
AZ
|
80
|
$1,400,000
|
Streets/Roads
|
-1
|
|
OLD TOWN Street Rehabilitation - Redo local Streets
|
Avondale
|
AZ
|
60
|
$1,200,000
|
Streets/Roads
|
-8
|
|
Buckeye Road Medians: 107th Avenue to Avondale Blvd. - Add Medians
|
Avondale
|
AZ
|
45
|
$1,200,000
|
Streets/Roads
|
-2
|
|
Thomas Road: 103rd to 99th Avenue - Add 1 westbound Lane
|
Avondale
|
AZ
|
65
|
$750,000
|
Streets/Roads
|
-1
|
|
Thomas Road (Alignment) Rancho Sante Fe to 119th Avenue - Pre-Design and Design for a multi-use path, bridge and lighting and landscaping
|
Avondale
|
AZ
|
55
|
$700,000
|
Streets/Roads
|
-7
|
|
McDowell Road: Aqua Fria Bridge to 119th Avenue (North Side) - Construct pedestrian improvements on the north side of McDowell Road
|
Avondale
|
AZ
|
40
|
$700,000
|
Streets/Roads
|
-4
|
|
10 & Avondale Blvd - Sidewalks, Art, ADA ramps, grading, paving & lighting
|
Avondale
|
AZ
|
55
|
$650,000
|
Streets/Roads
|
-3
|
|
Buckeye Road: Avondale Blvd to 117th Alignment - To design & construct sidewalks and landscaping
|
Avondale
|
AZ
|
40
|
$600,000
|
Streets/Roads
|
-7
|
|
Van Buren Street: El Mirage to 122nd Avenue (North Half) - Add 1 westbound through Lane, paving, curb & gutter
|
Avondale
|
AZ
|
55
|
$600,000
|
Streets/Roads
|
-2
|
|
Hill Street Extension - Extend Hill Street
|
Avondale
|
AZ
|
35
|
$600,000
|
Streets/Roads
|
-2
|
|
Woodrow Street Completed from Lower Buckeye to Buckeye Rd through Tank Farm Alignment - Add 2-lanes
|
Avondale
|
AZ
|
65
|
$500,000
|
Streets/Roads
|
0
|
|
Pre-treatment Education Program - Will train staff on pre-treatment procedures and provides resources for public education for legislative mandated pre-treatment of waste waters
|
Avondale
|
AZ
|
20
|
$15,000,000
|
Water
|
-11
|
|
Avondale Blvd Water Line improvements – Lower Buckeye Rd to Gila River
|
Avondale
|
AZ
|
35
|
$7,500,000
|
Water
|
2
|
|
Purchase Rigby Water Company
|
Avondale
|
AZ
|
30
|
$4,200,000
|
Water
|
-5
|
|
Rehabilitate existing Rigby Water Company
|
Avondale
|
AZ
|
120
|
$4,000,000
|
Water
|
-5
|
|
99th Ave Water Line Improvements – McDowell Road to Thomas
|
Avondale
|
AZ
|
69
|
$2,500,000
|
Water
|
-2
|
|
McDowell Road Water Line Improvements – El Mirage to Avondale Blvd
|
Avondale
|
AZ
|
54
|
$1,500,000
|
Water
|
-2
|
|
Thomas Road Water Line Improvements – 103rd Ave to 99th Ave
|
Avondale
|
AZ
|
69
|
$1,400,000
|
Water
|
-2
|
|
Well Security – Provide security to wells and water systems
|
Avondale
|
AZ
|
10
|
$1,200,000
|
Water
|
-4
|
|
Water Sewer Radio Readings – Replace antiquated sewer radios
|
Avondale
|
AZ
|
10
|
$1,000,000
|
Water
|
-2
|
|
Madison Heights Drainage Project - Will install drainage facilities such as catch basins, ditches, storm drain to reduce flooding in this CDBG eligible area/street
|
Avondale
|
AZ
|
60
|
$800,000
|
Water
|
-2
|
|
Water Line Replacement – Lower Buckeye to Dysart
|
Avondale
|
AZ
|
35
|
$800,000
|
Water
|
1
|
|
Waste Water Pretreatment - Will assist local businesses comply with legislative mandated pre-treatment of waste waters from local businesses
|
Avondale
|
AZ
|
5
|
$500,000
|
Water
|
-3
|
|
Old Town Avondale Revitalization - - Reconstruct streets and move utilities in old town Avondale; assist to stabilize Western Avenue businesses to relocate from marginal blighted building into newly constructed business spaces
|
Avondale
|
AZ
|
600
|
$22,000,000
|
CDBG
|
-21
|
|
Festival Fields Park Development – Develop a regional recreational facility that provides quality of life opportunities
|
Avondale
|
AZ
|
100
|
$6,000,000
|
CDBG
|
-9
|
|
Avondale Community Center Expansion & Renovation- Expand and renovate existing 12,000sf community center
|
Avondale
|
AZ
|
45
|
$3,000,000
|
CDBG
|
-8
|
|
Fourth Street Clean Up – A Seven acre site which is located within a CDBG area contains an old landfill which contains but not limited to: metal and block structures, building materials, metal storage sheds and other structures
|
Avondale
|
AZ
|
120
|
$2,900,000
|
CDBG
|
-5
|
|
Water Line and Sewer Improvements in CDBG designated areas
|
Avondale
|
AZ
|
150
|
$2,500,000
|
CDBG
|
-3
|
|
Central Avenue western to Van Buren – Mill and overlay
|
Avondale
|
AZ
|
46
|
$2,300,000
|
CDBG
|
-3
|
|
Coldwater Park Improvement Project - Add multi-model transportation trail head and ADA accessibility to regional trail system
|
Avondale
|
AZ
|
30
|
$2,000,000
|
CDBG
|
-10
|
|
Las Ligas District project - 3 lanes re-construction project 127th Ave Lower Buckeye to Dysart
|
Avondale
|
AZ
|
94
|
$1,400,000
|
CDBG
|
-3
|
|
Construct Buckeye Road Medians – 107th Ave to Avondale Blvd. in the Cashion District
|
Avondale
|
AZ
|
40
|
$1,210,000
|
CDBG
|
-3
|
|
Old Town Street Rehabilitation $1,200,000 83
|
Avondale
|
AZ
|
83
|
$1,200,000
|
CDBG
|
-5
|
|
Van Buren Dysart to La Jolla - Rehabilitation work $650,000 55
|
Avondale
|
AZ
|
55
|
$650,000
|
CDBG
|
-3
|
|
Hill Street Extension - Acquire right of way and complete street extension and drainage improvements to eliminate crime and blight
|
Avondale
|
AZ
|
40
|
$400,000
|
CDBG
|
-4
|
|
Energy Packages to go to first time home buyers who purchase foreclosed homes as part of the Neighborhood Stabilization Program
|
Avondale
|
AZ
|
20
|
$180,000
|
CDBG
|
3
|
|
LED Streetlight Pilot Program- To change out our street lights to LED fixtures
|
Avondale
|
AZ
|
20
|
$4,000,000
|
Energy
|
-10
|
|
Municipal Operations Service Center Solar energy system - Installation of an 112kw solar energy system
|
Avondale
|
AZ
|
50
|
$1,000,000
|
Energy
|
11
|
|
City Facility comprehensive energy management retrofit- to add motion activate switches, replace T-12 and incandescent lights with T-8 and CFL; Replace low efficient AC units
|
Avondale
|
AZ
|
25
|
$1,000,000
|
Energy
|
0
|
|
Northwest Public Safety Facility 50kw solar energy system
|
Avondale
|
AZ
|
35
|
$500,000
|
Energy
|
5
|
|
Energy Packages to go to first time home buyers who purchase foreclosed homes as part of the Neighborhood Stabilization Program
|
Avondale
|
AZ
|
20
|
$180,000
|
Energy
|
5
|
|
Madison Heights Projects - Project will install drainage facilities such as catch basins, ditches, and storm drain to reduce flooding in this CDBG eligible area/street
|
Avondale
|
AZ
|
60
|
$800,000
|
Housing
|
-6
|
|
Madison Heights Energy Project - Partner with local utility APS to provide energy efficient appliances, thermostats, water heaters, shade screens, low-flow fixtures and other CFL light fixtures
|
Avondale
|
AZ
|
50
|
$387,000
|
Housing
|
-6
|
|
Avondale Southwest Valley Fire Prevention Program
|
Avondale
|
AZ
|
2
|
$135,000
|
Housing
|
-5
|
|
School Resource Detective – Put in place needed SRD at school sites
|
Avondale
|
AZ
|
4
|
$600,000
|
Public Safety
|
-3
|
|
Weed and Seed – To improve and expand the youth-at-risk development program
|
Avondale
|
AZ
|
4
|
$600,000
|
Public Safety
|
-2
|
|
Gang Intelligence and Team Enforcement Mission (GIITEM) – Will train police officers in Gang enforcement strategies
|
Avondale
|
AZ
|
2
|
$440,000
|
Public Safety
|
-1
|
|
Information Technology improvements to provide 500 personal computers and infrastructure improvements for school libraries, classrooms and learning centers
|
Avondale
|
AZ
|
6
|
$1,500,000
|
Schools
|
-6
|
|
Park and Ride – 15 acre site
|
Avondale
|
AZ
|
200
|
$5,200,000
|
Transit
|
-2
|
|
Transit shelters- to purchase and install twenty (20) transit shelters throughout the city
|
Avondale
|
AZ
|
16
|
$400,000
|
Transit
|
-1
|
|
Bus-to purchase a fifteen (15) passenger vehicle to transport Senior Citizens and at-risk youth to community centers and community service agencies
|
Avondale
|
AZ
|
1
|
$50,000
|
Transit
|
-3
|
|
Neighborhood Street Improvement Plan. Rebuild and/or repave: McCormick Blvd, Miracle Mile, Mohave Drive, and Bullhead Parkway.
|
Bullhead City
|
AZ
|
50
|
$8,000,000
|
Streets/Roads
|
-7
|
|
Ramar Rd/Gold Rush/Arcadia Blvd. intersection improvement.
|
Bullhead City
|
AZ
|
50
|
$7,000,000
|
Streets/Roads
|
1
|
|
18-1 & 18-2 Lift Station and Gravity Sewer Improvements to mitigate increased volume resulting from septic tank removal and sewering of Bullhead City.
|
Bullhead City
|
AZ
|
25
|
$7,000,000
|
Water
|
0
|
|
Public Safety Facility
|
Casa Grande
|
AZ
|
735
|
$21,000,000
|
CDBG
|
-3
|
|
Courthouse
|
Casa Grande
|
AZ
|
350
|
$10,000,000
|
CDBG
|
-13
|
|
Korsten Rd Sewer Extension. 18, 24, 24, and 36 inch sewer line extensions.
|
Casa Grande
|
AZ
|
289
|
$8,270,610
|
CDBG
|
3
|
|
Fire Station 504
|
Casa Grande
|
AZ
|
157
|
$4,500,000
|
CDBG
|
5
|
|
Burris Sewer Interceptor. 36" sewer and 18" force main.
|
Casa Grande
|
AZ
|
112
|
$3,200,000
|
CDBG
|
0
|
|
Downtown Street Reconstruction. Pavement, utility, landscaping and pedestrian improvements
|
Casa Grande
|
AZ
|
105
|
$3,000,000
|
CDBG
|
-3
|
|
Len Colla Gymnasium.
|
Casa Grande
|
AZ
|
70
|
$2,000,000
|
CDBG
|
-11
|
|
Cottonwoad Lane widening from 2 to 5 lane. Aertial traffic lights
|
Casa Grande
|
AZ
|
437
|
$1,950,000
|
CDBG
|
3
|
|
Airport apron parking (east and west). Water, Sewer, Stormwater and Pavement Improvements
|
Casa Grande
|
AZ
|
52
|
$1,500,000
|
CDBG
|
-4
|
|
Park restroom project. New prototype restroom
|
Casa Grande
|
AZ
|
10
|
$310,000
|
CDBG
|
-7
|
|
Dysart Road at Thunderbird Intersection Improvements
|
El Mirage
|
AZ
|
48
|
$6,000,000
|
Streets/Roads
|
-2
|
|
Downtown Resurfacing
|
El Mirage
|
AZ
|
20
|
$2,500,000
|
Streets/Roads
|
-2
|
|
Dysart Road Reconstruction / Widening
|
El Mirage
|
AZ
|
13
|
$1,600,000
|
Streets/Roads
|
-1
|
|
El Mirage Road Resurfacing
|
El Mirage
|
AZ
|
10
|
$1,200,000
|
Streets/Roads
|
-2
|
|
Peoria Avenue Resurfacing
|
El Mirage
|
AZ
|
4
|
$500,000
|
Streets/Roads
|
-3
|
|
Dysart Road at Peoria Signal
|
El Mirage
|
AZ
|
2
|
$300,000
|
Streets/Roads
|
-2
|
|
Public Works Facility at WWTP
|
El Mirage
|
AZ
|
56
|
$7,000,000
|
Water
|
0
|
|
Cinnabar Water Campus
|
El Mirage
|
AZ
|
36
|
$4,500,000
|
Water
|
-3
|
|
El Mirage Road Sewer
|
El Mirage
|
AZ
|
9
|
$1,200,000
|
Water
|
1
|
|
FT. TUTHILL WATERLINE LOOP - extension of a 16" water transmission main. Will provide additional water supply, increase fire flows and replace undersized 100 year old water lines.
|
Flagstaff
|
AZ
|
0
|
$2,200,000
|
Water
|
-2
|
|
SUNNYSIDE IMPROVEMENTS - replace old, undersized waterlines in a residential neighborhood.
|
Flagstaff
|
AZ
|
0
|
$2,118,000
|
Water
|
-6
|
|
AIRPORT WELL - construct a new well to meet water supply demands during droughts.
|
Flagstaff
|
AZ
|
0
|
$1,450,000
|
Water
|
-3
|
|
CONNECT THE SINAGUA WELL - constract power lines and water lines, constrct well house to meet water demands during drought.
|
Flagstaff
|
AZ
|
0
|
$950,000
|
Water
|
-3
|
|
WEST SIDE INTERCEPTOR IMPROVEMENTS - replace approx. 200 LF of 8" sewer main with 18" PVC. Will increase capacity to accommodate projected growth.
|
Flagstaff
|
AZ
|
0
|
$700,000
|
Water
|
-5
|
|
FRANKLIN WATERLINE REPLACEMENT - replace approx. 2300 LF of undersized waterline. Will reduce maintenance and improve hydraulics.
|
Flagstaff
|
AZ
|
0
|
$653,000
|
Water
|
-2
|
|
MOHAWK DRIVE WATERLINE - replace approx. 380 LF of undersized waterline and provide any new service connections needed. Will reduce maintenance.
|
Flagstaff
|
AZ
|
0
|
$340,000
|
Water
|
-2
|
|
BEAVER STREET WATERLINE - replace approx. 1400 LF of undersized waterline and replace service connections.
|
Flagstaff
|
AZ
|
0
|
$218,000
|
Water
|
-1
|
|
SOUTH BEAVER STREET SEWER - replace approx. 950 LF of undersized sewer line. Will reduce maintenance.
|
Flagstaff
|
AZ
|
0
|
$142,000
|
Water
|
-1
|
|
COLORADO STREET WATERLINE RELOCATION - relocate approx. 400' of 6" waterline so that all of the line is in the public right-of-way. The line will also be upsized to 8".
|
Flagstaff
|
AZ
|
0
|
$75,000
|
Water
|
-2
|
|
Creation of a selective enforcement squad, which would based upon comstat analysis and communitity policing initiatives, provide proactive, problem solving tactics to combat crime.
|
Flagstaff
|
AZ
|
6
|
$438,000
|
Public Safety
|
-14
|
|
School Resource Officers for two high schools and two middle schools
|
Flagstaff
|
AZ
|
4
|
$292,000
|
Public Safety
|
-6
|
|
ST095 Williams Field - Railroad to Power
|
Gilbert
|
AZ
|
100
|
$50,000,000
|
Streets/Roads
|
-10
|
|
ST076 - Chandler Heights Val Vista to Greenfield
|
Gilbert
|
AZ
|
100
|
$18,500,000
|
Streets/Roads
|
0
|
|
ST057 Greenfield Road Pecos to Germann
|
Gilbert
|
AZ
|
100
|
$17,000,000
|
Streets/Roads
|
3
|
|
ST101 Greenfield Road Queen Creek to Chandler Heights
|
Gilbert
|
AZ
|
100
|
$13,000,000
|
Streets/Roads
|
-2
|
|
ST081 Queen Creek Road Val Vista Road to East Maricopa Floodway
|
Gilbert
|
AZ
|
100
|
$9,100,000
|
Streets/Roads
|
2
|
|
ST098 Higley Road Riggs to Hunt Highway Arterial Connection
|
Gilbert
|
AZ
|
100
|
$8,000,000
|
Streets/Roads
|
5
|
|
ST091 Cooper & Warner Road Intersection
|
Gilbert
|
AZ
|
100
|
$7,000,000
|
Streets/Roads
|
-5
|
|
ST125 Higley Road Frye to Pecos
|
Gilbert
|
AZ
|
75
|
$2,500,000
|
Streets/Roads
|
5
|
|
ST096 Recker Road - Ray to 1,320 feet North
|
Gilbert
|
AZ
|
50
|
$1,600,000
|
Streets/Roads
|
-1
|
|
Energy Saving Congestion Management and Traffic Signal Management System
|
Gilbert
|
AZ
|
10
|
$400,000
|
Streets/Roads
|
2
|
|
Description
|
City
|
State
|
Jobs
|
Cost
|
Program Type
|
Vote Ratio
|
|
Abandoned Railroad Cooridor Rails to Trails
|
Goodyear
|
AZ
|
40
|
$7,000,000
|
CDBG
|
0
|
|
Adaman Water Interconnect
|
Goodyear
|
AZ
|
35
|
$5,000,000
|
Water
|
-1
|
|
AFIS Kiosk
|
Goodyear
|
AZ
|
2
|
$40,000
|
Public Safety
|
-3
|
|
Arsenic Removal Equipment & Treatment Systems
|
Gilbert
|
AZ
|
50
|
$5,000,000
|
Water
|
3
|
|
Bank Street Overlay Project
|
Kingman
|
AZ
|
20
|
$300,000
|
Streets/Roads
|
-3
|
|
Brownfield Redevelopment - Estrella and MC85
|
Goodyear
|
AZ
|
500
|
$55,000,000
|
CDBG
|
-2
|
|
Bullard Wash Linear Park and Trail System
|
Goodyear
|
AZ
|
100
|
$15,000,000
|
CDBG
|
-1
|
|
Bullard, Bullard Wash to Wood Blvd.
|
Goodyear
|
AZ
|
35
|
$10,000,000
|
Streets/Roads
|
-2
|
|
Bullard, I-10 to McDowell
|
Goodyear
|
AZ
|
20
|
$115,515
|
Streets/Roads
|
0
|
|
Bullard, Lower Buckeye Parkway to Estrella Parkway
|
Goodyear
|
AZ
|
25
|
$6,000,000
|
Streets/Roads
|
-2
|
|
Bullard, Van Buren to I-10
|
Goodyear
|
AZ
|
25
|
$2,839,020
|
Streets/Roads
|
-2
|
|
Chandler Heights Road, Rainbow Valley Road to Reams Road
|
Goodyear
|
AZ
|
10
|
$990,000
|
Streets/Roads
|
0
|
|
Chandler Heights Road, Rainbow Valley Road to Western City Limits
|
Goodyear
|
AZ
|
5
|
$500,000
|
Streets/Roads
|
-1
|
|
Chandler Heights Road, Reams Road to Bullard Road
|
Goodyear
|
AZ
|
15
|
$1,300,000
|
Streets/Roads
|
-1
|
|
City Center Infrastructure Project - Water, Sewar, and Roadway
|
Goodyear
|
AZ
|
100
|
$10,000,000
|
CDBG
|
0
|
|
City Hall
|
Goodyear
|
AZ
|
200
|
$55,000,000
|
CDBG
|
-8
|
|
City Training Facility
|
Goodyear
|
AZ
|
25
|
$3,860,000
|
Public Safety
|
-4
|
|
Cotton Lane Water Line - EMR
|
Goodyear
|
AZ
|
35
|
$5,000,000
|
Water
|
2
|
|
Crime Scene Tach
|
Goodyear
|
AZ
|
1
|
$20,000
|
Public Safety
|
-5
|
|
Driving Simulator
|
Goodyear
|
AZ
|
1
|
$100,000
|
Public Safety
|
-5
|
|
El Rio Riparian Park and Trail System
|
Goodyear
|
AZ
|
100
|
$20,000,000
|
CDBG
|
-5
|
|
Elwood, Cotton to Sarival
|
Goodyear
|
AZ
|
20
|
$1,200,000
|
Streets/Roads
|
-1
|
|
EMR Park Phase II
|
Goodyear
|
AZ
|
30
|
$5,300,000
|
CDBG
|
4
|
|
Energy Saving Traffic Signal Installation Germann & Quartz
|
Gilbert
|
AZ
|
10
|
$250,000
|
Streets/Roads
|
-1
|
|
Energy Saving Traffic Signal Installation Riggs & Adora Trails
|
Gilbert
|
AZ
|
10
|
$250,000
|
Streets/Roads
|
2
|
|
Energy Saving Traffic Signal Installation Riggs & Recker
|
Gilbert
|
AZ
|
10
|
$300,000
|
Streets/Roads
|
5
|
|
Estrella Blvd., Vineyard to Elliot Road
|
Goodyear
|
AZ
|
10
|
$1,100,000
|
Streets/Roads
|
2
|
|
Goodyear Blvd., SE Corner
|
Goodyear
|
AZ
|
35
|
$4,000,000
|
Streets/Roads
|
-1
|
|
Goodyear Boulebard University Pedestrian Crossing
|
Goodyear
|
AZ
|
10
|
$3,000,000
|
CDBG
|
-2
|
|
Goodyear Boulevard Ballpark Pedestrian Crossing
|
Goodyear
|
AZ
|
10
|
$3,000,000
|
CDBG
|
0
|
|
Goodyear Park and Ride Bike Storage Lockers
|
Goodyear
|
AZ
|
5
|
$150,000
|
CDBG
|
-2
|
|
GWRF Capacity Expansion
|
Goodyear
|
AZ
|
40
|
$8,068,000
|
CDBG
|
-1
|
|
Heritage District Redevelopment Area Sidewalks
|
Gilbert
|
AZ
|
50
|
$590,000
|
CDBG
|
-1
|
|
Heritage District Vaughn Avenue Parking Garage Economic Development Support Project
|
Gilbert
|
AZ
|
100
|
$8,000,000
|
CDBG
|
-3
|
|
Hilltop Treatment Plant Upgrade and Extension
|
Kingman
|
AZ
|
620
|
$30,800,000
|
Water
|
6
|
|
Historic Goodyear Waterline
|
Goodyear
|
AZ
|
15
|
$1,300,000
|
Water
|
-1
|
|
Hualapai Mountain Road Reconstruction
|
Kingman
|
AZ
|
265
|
$4,400,000
|
Streets/Roads
|
-2
|
|
I-40/Kingman Crossing Traffic Interchange
|
Kingman
|
AZ
|
560
|
$27,095,000
|
Streets/Roads
|
6
|
|
I-40/Rattlesnake Wash Traffic Interchange
|
Kingman
|
AZ
|
625
|
$39,700,000
|
Streets/Roads
|
0
|
|
Internet Safety Instructor
|
Goodyear
|
AZ
|
1
|
$100,000
|
Public Safety
|
-9
|
|
Joint Police and Fire Training Facility
|
Gilbert
|
AZ
|
500
|
$30,000,000
|
Public Safety
|
-13
|
|
Library
|
Goodyear
|
AZ
|
100
|
$10,500,000
|
CDBG
|
-3
|
|
Lift Station Upgrade
|
Goodyear
|
AZ
|
5
|
$1,500,000
|
Water
|
-1
|
|
Lift Station Upgrade
|
Goodyear
|
AZ
|
5
|
$1,500,000
|
CDBG
|
-2
|
|
Litchfield Road Waterline
|
Goodyear
|
AZ
|
20
|
$2,000,000
|
Water
|
-1
|
|
Litchfield Road, Indian School to Wigwam
|
Goodyear
|
AZ
|
5
|
$350,000
|
Streets/Roads
|
-1
|
|
MC85
|
Goodyear
|
AZ
|
35
|
$5,600,000
|
Streets/Roads
|
1
|
|
McDowell, Litchfield to Bullard
|
Goodyear
|
AZ
|
35
|
$311,962
|
Streets/Roads
|
0
|
|
McDowell, Pebble Creek Pkwy to 303
|
Goodyear
|
AZ
|
15
|
$105,881
|
Streets/Roads
|
2
|
|
Mobile Command Vechile
|
Goodyear
|
AZ
|
2
|
$200,000
|
Public Safety
|
-7
|
|
Mohave Drive 24-inch Water Transmission Line
|
Kingman
|
AZ
|
30
|
$1,200,000
|
Water
|
0
|
|
Mohave Wash Pathway
|
Kingman
|
AZ
|
60
|
$500,000
|
Streets/Roads
|
-5
|
|
Neely Communications Tower reconfiguration
|
Gilbert
|
AZ
|
10
|
$300,000
|
Public Safety
|
1
|
|
Pebblecreek - McDowell
|
Goodyear
|
AZ
|
15
|
$461,963
|
Streets/Roads
|
0
|
|
PGA South Treated Water Line
|
Goodyear
|
AZ
|
20
|
$2,500,000
|
Water
|
-1
|
|
Police Firing Range
|
Goodyear
|
AZ
|
5
|
$2,000,000
|
Public Safety
|
-9
|
|
Police Radio System
|
Goodyear
|
AZ
|
15
|
$9,079,940
|
Public Safety
|
-10
|
|
Police/Fire Admin
|
Goodyear
|
AZ
|
100
|
$14,000,000
|
Public Safety
|
-8
|
|
Prism Firearms Training Simulator
|
Goodyear
|
AZ
|
1
|
$50,000
|
Public Safety
|
-5
|
|
Protection of Luke AFB - Property Acquisition
|
Goodyear
|
AZ
|
100
|
$26,000,000
|
CDBG
|
1
|
|
Rainbow Valley Road, Riggs Road to Hunt Road
|
Goodyear
|
AZ
|
5
|
$330,000
|
Streets/Roads
|
0
|
|
Regional Park and Ride
|
Goodyear
|
AZ
|
25
|
$11,500,000
|
Transit
|
-6
|
|
RID/BID Canal Trails
|
Goodyear
|
AZ
|
100
|
$15,000,000
|
CDBG
|
0
|
|
Sarival Road, Yuma to Durango
|
Goodyear
|
AZ
|
5
|
$330,000
|
Streets/Roads
|
0
|
|
School Resource Officers
|
Goodyear
|
AZ
|
6
|
$500,000
|
Public Safety
|
-1
|
|
Shoot House
|
Goodyear
|
AZ
|
1
|
$100,000
|
Public Safety
|
-9
|
|
Sonora Town Water, Wastewater, Streets & Street lighting project
|
Gilbert
|
AZ
|
50
|
$1,500,000
|
CDBG
|
0
|
|
Sonoran Valley Parkway
|
Goodyear
|
AZ
|
100
|
$53,000,000
|
Streets/Roads
|
-4
|
|
Southern Avenue Sidewalk Installation
|
Kingman
|
AZ
|
8
|
$90,000
|
Streets/Roads
|
-1
|
|
SR303
|
Goodyear
|
AZ
|
10
|
$10,000,000
|
Streets/Roads
|
3
|
|
Staffing Software
|
Goodyear
|
AZ
|
1
|
$25,000
|
Public Safety
|
-5
|
|
Stockton Hill Road/Syacamore Avenue Restoration
|
Kingman
|
AZ
|
12
|
$80,000
|
Streets/Roads
|
0
|
|
Surface Water Pipelines
|
Goodyear
|
AZ
|
25
|
$3,000,000
|
Water
|
-1
|
|
Thomas Road, Litchfield to Dysart
|
Goodyear
|
AZ
|
15
|
$560,000
|
Streets/Roads
|
-1
|
|
Topeka Street Sidewalk Installation
|
Kingman
|
AZ
|
12
|
$130,000
|
Streets/Roads
|
-2
|
|
Train Depot
|
Goodyear
|
AZ
|
25
|
$1,000,000
|
CDBG
|
2
|
|
Underdeck Pedestrian Lighting at Bullard Wash I-10 Bridge
|
Goodyear
|
AZ
|
5
|
$150,000
|
CDBG
|
0
|
|
Unidynamics Superfund Cleanup
|
Goodyear
|
AZ
|
500
|
$20,000,000
|
CDBG
|
-5
|
|
WA067 - Service Zone Intertie
|
Gilbert
|
AZ
|
50
|
$750,000
|
Water
|
-1
|
|
WA068 - Well 20 Booster Station
|
Gilbert
|
AZ
|
50
|
$550,000
|
Water
|
-1
|
|
WA069 - Higley and Baseline Water and Sewer Economic Development
|
Gilbert
|
AZ
|
75
|
$3,600,000
|
Water
|
1
|
|
WA076 - Western Canal 20" Water Main
|
Gilbert
|
AZ
|
50
|
$2,500,000
|
Water
|
2
|
|
WA077 - Hobson Street 12" Water line replacement
|
Gilbert
|
AZ
|
50
|
$700,000
|
Water
|
-1
|
|
Wastewater Collection Lines
|
Goodyear
|
AZ
|
10
|
$1,500,000
|
Water
|
-1
|
|
Water/Waste Water SCADA System
|
Goodyear
|
AZ
|
30
|
$4,000,000
|
Water
|
0
|
|
Water/Waste Water Transmission Lines
|
Goodyear
|
AZ
|
35
|
$5,000,000
|
Water
|
1
|
|
Western Avenue Street Improvements, Beverly to Airway
|
Kingman
|
AZ
|
25
|
$350,000
|
Streets/Roads
|
1
|
|
WRF Capacity Expansion
|
Goodyear
|
AZ
|
40
|
$8,000,000
|
Water
|
2
|
|
WW044 Wastewater Reclaimed Water System Valve stations
|
Gilbert
|
AZ
|
25
|
$600,000
|
Water
|
-1
|
|
WW045 Gilbert Road Force Main and Sewer
|
Gilbert
|
AZ
|
75
|
$7,000,000
|
Water
|
1
|
|
WW070 Candlewood Lift Station Improvements
|
Gilbert
|
AZ
|
75
|
$7,000,000
|
Water
|
0
|
|
WW081 - Manhole relocation from East Maricopa Floodway
|
Gilbert
|
AZ
|
10
|
$450,000
|
Water
|
-1
|
|
WW082 Linda Lane Sewer Tap replacements
|
Gilbert
|
AZ
|
15
|
$400,000
|
Water
|
-1
|
|
WW089 Elliot District Park Recovery Well
|
Gilbert
|
AZ
|
15
|
$700,000
|
Water
|
-1
|
|
WW090 Direct Reclaimed water injection wells
|
Gilbert
|
AZ
|
15
|
$900,000
|
Water
|
-1
|
|
WW091 Crossroads Lift Station Odor Scrubber replacement
|
Gilbert
|
AZ
|
50
|
$2,500,000
|
Water
|
3
|
|
Yuma Road Bridge over Bullard Wash
|
Goodyear
|
AZ
|
35
|
$6,000,000
|
Streets/Roads
|
-1
|
|
Yuma Road, Estrella Parkway to Litchfield
|
Goodyear
|
AZ
|
40
|
$13,000,000
|
Streets/Roads
|
-1
|
|
Yuma Road, Estrella to Litchfield Road
|
Goodyear
|
AZ
|
100
|
$11,000,000
|
Streets/Roads
|
1
|
|
Yuma Road, Sarival to 167th Avenue
|
Goodyear
|
AZ
|
5
|
$660,000
|
Streets/Roads
|
0
|
|
Description
|
City
|
State
|
Jobs
|
Cost
|
Program Type
|
Vote Ratio
|
|
City Well No. 11 Pumping Equipment
|
Kingman
|
AZ
|
25
|
$600,000
|
Water
|
1
|
|
Fort Beale Water Tank Restoration
|
Kingman
|
AZ
|
25
|
$600,000
|
Water
|
-1
|
|
Mohave Channel Sewer Extension
|
Kingman
|
AZ
|
35
|
$500,000
|
Water
|
-2
|
|
City Well No. 11 Forebay Tank
|
Kingman
|
AZ
|
25
|
$500,000
|
Water
|
0
|
|
City Well No. 11 Booster Station
|
Kingman
|
AZ
|
20
|
$400,000
|
Water
|
2
|
|
Mohave Avenue/ Buchanan Street Water Line Replacement
|
Kingman
|
AZ
|
10
|
$125,000
|
Water
|
3
|
|
Metcalfe Road Water Line Replacement
|
Kingman
|
AZ
|
8
|
$100,000
|
Water
|
1
|
|
Chestneu Street Water Line Extension
|
Kingman
|
AZ
|
7
|
$80,000
|
Water
|
1
|
|
Railroad Depot Restoration Project
|
Kingman
|
AZ
|
40
|
$650,000
|
CDBG
|
-6
|
|
Lewis Kingman Park Restrooms
|
Kingman
|
AZ
|
25
|
$200,000
|
CDBG
|
-10
|
|
Locomotive Park Train Structure
|
Kingman
|
AZ
|
15
|
$110,000
|
CDBG
|
-13
|
|
Fire Station No. 2 Reconstruction
|
Kingman
|
AZ
|
272
|
$5,827,000
|
Public Safety
|
1
|
|
Fire Station No. 5
|
Kingman
|
AZ
|
219
|
$3,650,000
|
Public Safety
|
1
|
|
Centennial Park Light Replacements
|
Kingman
|
AZ
|
20
|
$200,000
|
Public Safety
|
-9
|
|
Residential Flood Control/Street Widening: Non-Sewer Area
|
Lake Havasu City
|
AZ
|
1000
|
$20,000,000
|
Streets/Roads
|
-5
|
|
Contact Point Economic Development: Roads, Infrastructure, Development on BLM R&PP Lease to City
|
Lake Havasu City
|
AZ
|
90
|
$10,200,000
|
Streets/Roads
|
-4
|
|
SR95 Streetscapes (14 miles)
|
Lake Havasu City
|
AZ
|
400
|
$10,000,000
|
Streets/Roads
|
-6
|
|
Highway 95 Multi-Use Pathway Extension (14 miles)
|
Lake Havasu City
|
AZ
|
220
|
$5,250,000
|
Streets/Roads
|
-4
|
|
Residential Flood Control/Street Widening: Sewer Area
|
Lake Havasu City
|
AZ
|
200
|
$5,000,000
|
Streets/Roads
|
-3
|
|
SR95 Multi Use Pathway Extension (14 miles)
|
Lake Havasu City
|
AZ
|
200
|
$5,000,000
|
Streets/Roads
|
-3
|
|
Lake Havasu Avenue-Widen
|
Lake Havasu City
|
AZ
|
120
|
$4,150,000
|
Streets/Roads
|
3
|
|
Sweetwater/Maricopa Widening/Sidewalks
|
Lake Havasu City
|
AZ
|
125
|
$4,000,000
|
Streets/Roads
|
-2
|
|
Flood Control: El Dorado Wash Culvert Installations (3)
|
Lake Havasu City
|
AZ
|
100
|
$3,250,000
|
Streets/Roads
|
1
|
|
McCulloch (on Island) Repaving
|
Lake Havasu City
|
AZ
|
65
|
$2,000,000
|
Streets/Roads
|
-4
|
|
Acoma Overlay Project
|
Lake Havasu City
|
AZ
|
75
|
$2,000,000
|
Streets/Roads
|
-1
|
|
Island Roadway and Drainage Projects
|
Lake Havasu City
|
AZ
|
75
|
$2,000,000
|
Streets/Roads
|
-2
|
|
Smoketree and McCulloch Overlay
|
Lake Havasu City
|
AZ
|
50
|
$1,500,000
|
Streets/Roads
|
-1
|
|
Flood Control: Swanson Box Culvert (Pima Wash)
|
Lake Havasu City
|
AZ
|
40
|
$1,250,000
|
Streets/Roads
|
1
|
|
El Dorado Wash Culvert Improvements (Palo Verde)
|
Lake Havasu City
|
AZ
|
40
|
$1,250,000
|
Streets/Roads
|
1
|
|
El Dorado Wash Culvert Improvements (Lake Havasu Ave)
|
Lake Havasu City
|
AZ
|
30
|
$1,000,000
|
Streets/Roads
|
1
|
|
N. Palo Verde Blvd Widening Phase II
|
Lake Havasu City
|
AZ
|
35
|
$1,000,000
|
Streets/Roads
|
0
|
|
Flood Control: Wash Stabilization & Flood Warning System Projects
|
Lake Havasu City
|
AZ
|
25
|
$1,000,000
|
Streets/Roads
|
1
|
|
High School Bank Restoration Project, El Dorado Wash
|
Lake Havasu City
|
AZ
|
25
|
$800,000
|
Streets/Roads
|
1
|
|
SARA Park Road Widening
|
Lake Havasu City
|
AZ
|
35
|
$520,000
|
Streets/Roads
|
2
|
|
Flood Control: Aqua Wash Culvert Improvements (McCulloch Blvd)
|
Lake Havasu City
|
AZ
|
25
|
$500,000
|
Streets/Roads
|
0
|
|
Acoma-S. Palo Verde & Acoma Smoketree Traffic Signals (Safety)
|
Lake Havasu City
|
AZ
|
13
|
$500,000
|
Streets/Roads
|
4
|
|
London Bridge Roadway Replacement/Texture
|
Lake Havasu City
|
AZ
|
25
|
$350,000
|
Streets/Roads
|
0
|
|
SR 95 Streetscapes, Mesquite to Alley Parking Area
|
Lake Havasu City
|
AZ
|
15
|
$250,000
|
Streets/Roads
|
-1
|
|
London Bridge Abutment Repairs
|
Lake Havasu City
|
AZ
|
15
|
$250,000
|
Streets/Roads
|
2
|
|
Main Street Entry Signs
|
Lake Havasu City
|
AZ
|
15
|
$200,000
|
Streets/Roads
|
-6
|
|
Wastewater System Expansion Program Completion
|
Lake Havasu City
|
AZ
|
1500
|
$161,507,000
|
Water
|
9
|
|
Bill Williams Diversion Project
|
Lake Havasu City
|
AZ
|
800
|
$60,000,000
|
Water
|
-2
|
|
Water Booster Stations 1, 3 & 5
|
Lake Havasu City
|
AZ
|
200
|
$10,000,000
|
Water
|
2
|
|
Booster Station No. 3 Reconstruction
|
Lake Havasu City
|
AZ
|
25
|
$3,000,000
|
Water
|
1
|
|
Station 5A Reservoir
|
Lake Havasu City
|
AZ
|
15
|
$1,500,000
|
Water
|
1
|
|
North Havasu Pump Station Tanks
|
Lake Havasu City
|
AZ
|
25
|
$1,000,000
|
Water
|
0
|
|
SARA Park Water Main
|
Lake Havasu City
|
AZ
|
40
|
$690,000
|
Water
|
0
|
|
SARA Park Water Re-Use Conservation Line
|
Lake Havasu City
|
AZ
|
40
|
$590,000
|
Water
|
2
|
|
Water Treatment Plant Security Wall
|
Lake Havasu City
|
AZ
|
25
|
$500,000
|
Water
|
2
|
|
North Havasu Booster Station (Airport)
|
Lake Havasu City
|
AZ
|
15
|
$500,000
|
Water
|
0
|
|
Bridgewater Channel Dredging Safety Project, Federal Waterway
|
Lake Havasu City
|
AZ
|
9
|
$365,000
|
Water
|
3
|
|
Water System Storage Building
|
Lake Havasu City
|
AZ
|
20
|
$350,000
|
Water
|
0
|
|
Desert View Water Main Replacement
|
Lake Havasu City
|
AZ
|
10
|
$250,000
|
Water
|
0
|
|
Temperature Control at WTP/Collector Well for Pumps
|
Lake Havasu City
|
AZ
|
10
|
$200,000
|
Water
|
0
|
|
30-inch, 36inch Interconnect SR95
|
Lake Havasu City
|
AZ
|
10
|
$120,000
|
Water
|
0
|
|
Booster "A" & "C" Demolition
|
Lake Havasu City
|
AZ
|
5
|
$100,000
|
Water
|
0
|
|
Station 3C Under-Floor Cathodic System
|
Lake Havasu City
|
AZ
|
6
|
$100,000
|
Water
|
0
|
|
MCC Park: multi use path, restrooms, 5 baseball/softball field fences, 4 multipurpose fields, 4 parking areas, recreation center, science center, utility extension
|
Lake Havasu City
|
AZ
|
750
|
$26,800,000
|
CDBG
|
-12
|
|
SARA Park Recreation Center & 9 baseball-softball fences
|
Lake Havasu City
|
AZ
|
532
|
$19,000,000
|
CDBG
|
-9
|
|
SARA Park Recreation Center/9 baseball-softball fences
|
Lake Havasu City
|
AZ
|
532
|
$19,000,000
|
CDBG
|
-13
|
|
Economic Syngergistic Development: Business Center at Airport
|
Lake Havasu City
|
AZ
|
95
|
$16,000,000
|
CDBG
|
-7
|
|
Main Street Redevelopment: Pima Wash Plaza Area Project, public space
|
Lake Havasu City
|
AZ
|
75
|
$10,000,000
|
CDBG
|
-1
|
|
Contact Point Economic Development: Performing Arts Center
|
Lake Havasu City
|
AZ
|
100
|
$9,400,000
|
CDBG
|
-7
|
|
Multi Story Parking Structure, Main Street Redevelopment
|
Lake Havasu City
|
AZ
|
100
|
$6,600,000
|
CDBG
|
-4
|
|
Police Dispatch & Evidence Expansion
|
Lake Havasu City
|
AZ
|
125
|
$5,880,000
|
CDBG
|
1
|
|
Economic Synergistic Development: Airport Terminal
|
Lake Havasu City
|
AZ
|
90
|
$4,000,000
|
CDBG
|
-3
|
|
Economic Synergistic Development: Parking Garage at Airport
|
Lake Havasu City
|
AZ
|
79
|
$4,000,000
|
CDBG
|
-5
|
|
Rotary Park restrooms, backstops, ramadas, infrastructure, effluent line extension, walkway lighting
|
Lake Havasu City
|
AZ
|
90
|
$3,200,000
|
CDBG
|
1
|
|
Dick Samp Memorial Park basketball court, dog park, road and utility extension; multipurpose field
|
Lake Havasu City
|
AZ
|
90
|
$3,200,000
|
CDBG
|
-15
|
|
Rotary Park Restrooms, Backstops, Ramadas, Infrastructure, Effluent Line Extension, Walkway Lighting
|
Lake Havasu City
|
AZ
|
90
|
$3,200,000
|
CDBG
|
-3
|
|
Dick Samp Memorial Park Facilities
|
Lake Havasu City
|
AZ
|
90
|
$3,200,000
|
CDBG
|
-8
|
|
New Fire Station, Mid to Low Income Area
|
Lake Havasu City
|
AZ
|
19
|
$3,000,000
|
CDBG
|
5
|
|
Specialist Patrick A. Tinnell Memorial Sports Park Construction
|
Lake Havasu City
|
AZ
|
25
|
$1,400,000
|
CDBG
|
-3
|
|
Site Six Building, New Construction
|
Lake Havasu City
|
AZ
|
30
|
$1,330,000
|
CDBG
|
-2
|
|
Pedestrian Bridge over Bridgewater Channel, Channel Riverwalk District
|
Lake Havasu City
|
AZ
|
10
|
$1,000,000
|
CDBG
|
-3
|
|
CVB Visitor Information Center w/ Public Restrooms
|
Lake Havasu City
|
AZ
|
14
|
$775,000
|
CDBG
|
-2
|
|
City Hall Parking Lot Expansion
|
Lake Havasu City
|
AZ
|
85
|
$750,000
|
CDBG
|
-1
|
|
Island/Channel Special Event Parking
|
Lake Havasu City
|
AZ
|
45
|
$750,000
|
CDBG
|
1
|
|
Police Academy Training Building
|
Lake Havasu City
|
AZ
|
85
|
$750,000
|
CDBG
|
4
|
|
Dick Samp Memorial Park: Environmental Restoration of Former Landfill
|
Lake Havasu City
|
AZ
|
10
|
$620,000
|
CDBG
|
-2
|
|
SARA Park Equestrian Area (grading, restrooms, power, water, grandstands)
|
Lake Havasu City
|
AZ
|
25
|
$440,000
|
CDBG
|
-3
|
|
Island Jogging Path Rehabilitation
|
Lake Havasu City
|
AZ
|
15
|
$350,000
|
CDBG
|
-3
|
|
Police Facility Parking & Entrance Security
|
Lake Havasu City
|
AZ
|
65
|
$350,000
|
CDBG
|
-1
|
|
Fire Dept Open Air/Covered Classroom & Support Facilities
|
Lake Havasu City
|
AZ
|
6
|
$310,000
|
CDBG
|
0
|
|
Windsor Beach Launch Ramp Courtesy Docks replacement
|
Lake Havasu City
|
AZ
|
10
|
$200,000
|
CDBG
|
4
|
|
Fire Dept Paving of Training Grounds
|
Lake Havasu City
|
AZ
|
7
|
$162,200
|
CDBG
|
-2
|
|
SARA Park 3-Phase Power
|
Lake Havasu City
|
AZ
|
10
|
$150,000
|
CDBG
|
-2
|
|
Fire Dept OSHA-Required Confined Space Training Prop
|
Lake Havasu City
|
AZ
|
6
|
$100,000
|
CDBG
|
2
|
|
Fire Dept Open Air Apparatus Storage Facility/Carport
|
Lake Havasu City
|
AZ
|
4
|
$90,000
|
CDBG
|
1
|
|
Site Six Building Demolition
|
Lake Havasu City
|
AZ
|
4
|
$70,000
|
CDBG
|
-2
|
|
Site Six Dock Shade Structures
|
Lake Havasu City
|
AZ
|
4
|
$40,000
|
CDBG
|
-3
|
|
Site Six Ramp Extension (Safety)
|
Lake Havasu City
|
AZ
|
3
|
$20,000
|
CDBG
|
-1
|
|
City Hall Retrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project
|
Lake Havasu City
|
AZ
|
130
|
$7,280,000
|
Energy
|
1
|
|
Community Center, Treatment Plant Retrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project
|
Lake Havasu City
|
AZ
|
120
|
$6,800,000
|
Energy
|
4
|
|
PWMFRetrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project
|
Lake Havasu City
|
AZ
|
60
|
$3,400,000
|
Energy
|
1
|
|
Police Facility Solar Panels
|
Lake Havasu City
|
AZ
|
75
|
$400,000
|
Energy
|
3
|
|
Police, Fire, PW Infrastructure Digital Radio System
|
Lake Havasu City
|
AZ
|
35
|
$75,000,000
|
Public Safety
|
-10
|
|
Public Safety Wireless Mesh 4.9 Network
|
Lake Havasu City
|
AZ
|
125
|
$2,100,000
|
Public Safety
|
-1
|
|
Public Safety Infrastructure Tower and Digital Repeater System
|
Lake Havasu City
|
AZ
|
10
|
$1,250,000
|
Public Safety
|
-2
|
|
Public Safety CAD System Upgrade
|
Lake Havasu City
|
AZ
|
80
|
$850,000
|
Public Safety
|
-3
|
|
Description
|
City
|
State
|
Jobs
|
Cost
|
Program Type
|
Vote Ratio
|
|
City Hall Public Safety Emergency Infrastructure Power System
|
Lake Havasu City
|
AZ
|
8
|
$470,000
|
Public Safety
|
0
|
|
Island Towers Public Safety Infrastructure Security System and Fencing
|
Lake Havasu City
|
AZ
|
0
|
$165,000
|
Public Safety
|
-1
|
|
City-wide Emergency Alert Radio System
|
Lake Havasu City
|
AZ
|
75
|
$150,000
|
Public Safety
|
0
|
|
City Hall Public Safety Infrastructure Video Security System
|
Lake Havasu City
|
AZ
|
5
|
$110,000
|
Public Safety
|
-2
|
|
6 Trolleys (3 Routes & Tourism Transportation Services
|
Lake Havasu City
|
AZ
|
9
|
$1,980,000
|
Transit
|
-7
|
|
Arterial, Collector, Residential Overlays
|
Mesa
|
AZ
|
0
|
$20,000,000
|
Streets/Roads
|
-7
|
|
Power Road: Phase III, Santan Freeway to Pecos Road
|
Mesa
|
AZ
|
0
|
$19,000,000
|
Streets/Roads
|
4
|
|
Ray Road: Sossaman Road to Ellsworth Road
|
Mesa
|
AZ
|
0
|
$18,500,000
|
Streets/Roads
|
0
|
|
Mesa Drive: Southern Avenue to US-60 (Superstition Fwy)
|
Mesa
|
AZ
|
0
|
$18,000,000
|
Streets/Roads
|
-6
|
|
Broadway Road, Sossaman Road to Hawes Road
|
Mesa
|
AZ
|
0
|
$14,300,000
|
Streets/Roads
|
-1
|
|
ASU Polytechnic Ring Road located at Phoenix-Mesa Gateway Airport
|
Mesa
|
AZ
|
0
|
$13,500,000
|
Streets/Roads
|
6
|
|
Gilbert Road and University Drive Intersection
|
Mesa
|
AZ
|
0
|
$12,000,000
|
Streets/Roads
|
0
|
|
Greenfield Rd: Baseline Road to Southern Avenue
|
Mesa
|
AZ
|
0
|
$6,500,000
|
Streets/Roads
|
1
|
|
Dobson Road and University Drive Intersection
|
Mesa
|
AZ
|
0
|
$6,500,000
|
Streets/Roads
|
-2
|
|
Dobson Road and Guadalupe Road Intersection
|
Mesa
|
AZ
|
0
|
$5,500,000
|
Streets/Roads
|
-1
|
|
Hawes Road: Santan Fwy to Ray Road
|
Mesa
|
AZ
|
0
|
$3,800,000
|
Streets/Roads
|
0
|
|
East Loop ITS Device Deployment (Red Mountain Freeway and US 60)
|
Mesa
|
AZ
|
0
|
$3,000,000
|
Streets/Roads
|
2
|
|
Country Club Drive ITS Improvements
|
Mesa
|
AZ
|
0
|
$2,509,640
|
Streets/Roads
|
0
|
|
Fiber Optic Lines - Signal System for US 60 Connectivity, Phase 4B
|
Mesa
|
AZ
|
0
|
$2,500,000
|
Streets/Roads
|
1
|
|
Santan Freeway ITS Fiber Backbone, US 60 to Power Road
|
Mesa
|
AZ
|
0
|
$2,000,000
|
Streets/Roads
|
2
|
|
Water and Wastewater Improvements on ASU Polytechnic Campus (Phase II and III)
|
Mesa
|
AZ
|
0
|
$14,700,000
|
Water
|
1
|
|
Raw Waterline from CAP Canal to South CAP Water Treatment Plant
|
Mesa
|
AZ
|
0
|
$10,034,200
|
Water
|
1
|
|
Sunland Springs, Siphon Draw Flood Control Improvements
|
Mesa
|
AZ
|
0
|
$8,230,520
|
Water
|
1
|
|
Various Storm Sewer Improvements
|
Mesa
|
AZ
|
0
|
$8,000,000
|
Water
|
-1
|
|
Replacement of Aging Residential Water Lines
|
Mesa
|
AZ
|
0
|
$6,614,000
|
Water
|
1
|
|
Southeast Water Reclamation Plant Improvements
|
Mesa
|
AZ
|
0
|
$6,500,000
|
Water
|
1
|
|
Water and Wastewater Lines on Warner Road; Power to Ellsworth Road
|
Mesa
|
AZ
|
0
|
$5,688,000
|
Water
|
0
|
|
Drilling and Equipping New Well Sites
|
Mesa
|
AZ
|
0
|
$4,200,000
|
Water
|
1
|
|
Rehabilitate Wastewater Crossings under US 60
|
Mesa
|
AZ
|
0
|
$4,000,000
|
Water
|
2
|
|
Water Line and Gas Line Replacement on Broadway Road; Country Club to Gilbert Road
|
Mesa
|
AZ
|
0
|
$3,675,000
|
Water
|
2
|
|
Sewer Line on Rittenhouse Road; Power Road to East Mesa Interceptor
|
Mesa
|
AZ
|
0
|
$3,220,000
|
Water
|
1
|
|
Replacement of Water Lines in Desert Sands Subdivision
|
Mesa
|
AZ
|
0
|
$3,029,600
|
Water
|
1
|
|
Water Line on Signal Butte; Elliot Road to Ray Road
|
Mesa
|
AZ
|
0
|
$3,000,000
|
Water
|
-1
|
|
Water Line on Hawes Road: Elliot Road to Ray Road
|
Mesa
|
AZ
|
0
|
$3,000,000
|
Water
|
-1
|
|
New Sewer Sulfide Stations
|
Mesa
|
AZ
|
0
|
$3,000,000
|
Water
|
0
|
|
Improvements to Water Pump Stations
|
Mesa
|
AZ
|
0
|
$2,800,000
|
Water
|
0
|
|
Northwest Water Reclamation Plant Improvements
|
Mesa
|
AZ
|
0
|
$2,700,000
|
Water
|
-1
|
|
Water Line on Pecos Road; Signal Butte to Ellsworth Road
|
Mesa
|
AZ
|
0
|
$2,356,480
|
Water
|
1
|
|
Flow Diversion Structure for Northwest Reclamation Plant
|
Mesa
|
AZ
|
0
|
$2,300,000
|
Water
|
-1
|
|
Equipping Well Sites
|
Mesa
|
AZ
|
0
|
$2,100,000
|
Water
|
-1
|
|
Water Line on Ellsworth Road; Ray to Pecos Road
|
Mesa
|
AZ
|
0
|
$1,750,000
|
Water
|
-1
|
|
Water Line on Signal Butte; Ray Road to Pecos Road
|
Mesa
|
AZ
|
0
|
$1,700,000
|
Water
|
-1
|
|
North CAP Water Treatment Plant Improvements
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Water
|
-1
|
|
Water Line on Elliot Road; Sossaman Road to Hawes Road
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Water
|
0
|
|
Sewer Line on Gateway Avenue; Crismon to Signal Butte
|
Mesa
|
AZ
|
0
|
$1,400,000
|
Water
|
0
|
|
Apache Country Club Estates Water Line Replacement
|
Mesa
|
AZ
|
0
|
$1,351,000
|
Water
|
1
|
|
Various Wastewater Manhole Rehabilitation
|
Mesa
|
AZ
|
0
|
$1,300,000
|
Water
|
-1
|
|
Diversion Structures at Baseline/Ellsworth and Broadway/56th Street
|
Mesa
|
AZ
|
0
|
$1,300,000
|
Water
|
-1
|
|
Upgrade Electrical Equipment at Well Sites
|
Mesa
|
AZ
|
0
|
$1,200,000
|
Water
|
0
|
|
Water Line on Sossaman Road; 1/2 mile N. of Elliot Road to Ray Road
|
Mesa
|
AZ
|
0
|
$1,100,000
|
Water
|
0
|
|
Water Line on Elliot Road; Power Road to Sossaman Road
|
Mesa
|
AZ
|
0
|
$1,000,000
|
Water
|
1
|
|
Falcon Field Water Zone Pump Station #6
|
Mesa
|
AZ
|
0
|
$1,000,000
|
Water
|
0
|
|
Water Line on Sossaman Road, 1/2 mile N. of Willamsfield Road to Pecos Road
|
Mesa
|
AZ
|
0
|
$1,000,000
|
Water
|
1
|
|
Security Improvements at Desert Well #11
|
Mesa
|
AZ
|
0
|
$561,423
|
Water
|
-2
|
|
Phx-Mesa Gateway Airport Construct Taxiway L
|
Mesa
|
AZ
|
0
|
$9,023,000
|
Airport
|
3
|
|
Phx-Mesa Gateway Airport Construct Taxiway B from L to N
|
Mesa
|
AZ
|
0
|
$9,000,000
|
Airport
|
2
|
|
Phx-Mesa Gateway Airport Construct Alpha Apron
|
Mesa
|
AZ
|
0
|
$6,000,000
|
Airport
|
2
|
|
Falcon Field Airport TWY F Construction (Phase 1)
|
Mesa
|
AZ
|
0
|
$5,000,000
|
Airport
|
3
|
|
Falcon Field Airport TWY F Construction (Phase 2)
|
Mesa
|
AZ
|
0
|
$5,000,000
|
Airport
|
3
|
|
Phx-Mesa Gateway Airport Construct Airfield/Apron Drainage
|
Mesa
|
AZ
|
0
|
$3,800,000
|
Airport
|
1
|
|
Falcon Field Airport East Side Aeronautical Use Taxiway
|
Mesa
|
AZ
|
0
|
$2,500,000
|
Airport
|
0
|
|
Falcon Field Airport Taxiway B Reconfiguration & Install Runway Guard Lights (Phase 2)
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Airport
|
0
|
|
Falcon Field 4R Run-up Area
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Airport
|
3
|
|
Falcon Field Airport Taxiway B Reconfiguration & Install Runway Guard Lights (Phase 1)
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Airport
|
1
|
|
Falcon Field Airport Anzio Ramp Expansion
|
Mesa
|
AZ
|
0
|
$1,500,000
|
Airport
|
-1
|
|
Falcon Field Airport High-Speed Runway Exits for RWY 4L-22R
|
Mesa
|
AZ
|
0
|
$788,000
|
Airport
|
1
|
|
Falcon Field Airport Falcon Field Airfield Storm Drainage System
|
Mesa
|
AZ
|
0
|
$600,000
|
Airport
|
2
|
|
Falcon Field Airport RWY/TWY Pavement Preservation
|
Mesa
|
AZ
|
0
|
$530,000
|
Airport
|
6
|
|
Falcon Field Airport Blast Pads - RWY 4L-22R
|
Mesa
|
AZ
|
0
|
$525,000
|
Airport
|
1
|
|
Falcon Field Airport Northwest Quadrant Access Roads
|
Mesa
|
AZ
|
0
|
$400,000
|
Airport
|
0
|
|
Falcon Field Airport RWY 4R-22L PAPI/REIL Upgrades
|
Mesa
|
AZ
|
0
|
$325,000
|
Airport
|
3
|
|
Falcon Field Airport East Ramp Reconfiguration
|
Mesa
|
AZ
|
0
|
$300,000
|
Airport
|
0
|
|
Falcon Field Airport TWY F Construction
|
Mesa
|
AZ
|
0
|
$250,000
|
Airport
|
0
|
|
Falcon Field Airport Automated Weather Observing System
|
Mesa
|
AZ
|
0
|
$250,000
|
Airport
|
6
|
|
Falcon Field Airport Higley Ramp Reconstruction
|
Mesa
|
AZ
|
0
|
$180,000
|
Airport
|
3
|
|
Falcon Field Airport Taxiway B Reconfiguration & Install Runway Guard Lights
|
Mesa
|
AZ
|
0
|
$150,000
|
Airport
|
2
|
|
Falcon Field Airport Anzio Ramp Expansion
|
Mesa
|
AZ
|
0
|
$150,000
|
Airport
|
-1
|
|
Falcon Field Airport Environmental Assessment for TWY F construction
|
Mesa
|
AZ
|
0
|
$100,000
|
Airport
|
0
|
|
Falcon Field Airport High-Speed Runway Exits for RWY 4L-22R
|
Mesa
|
AZ
|
0
|
$75,000
|
Airport
|
-1
|
|
Gas Gate Station #3 and 8" High Pressure Gas Main on Power Road; Pecos Road to Baseline Road
|
Mesa
|
AZ
|
0
|
$3,356,000
|
Energy
|
3
|
|
Gas Main and Water Service Replacement in Quarter Section 21C Neighborhood
|
Mesa
|
AZ
|
0
|
$3,000,000
|
Energy
|
-2
|
|
SCADA System for Natural Gas Distribution System
|
Mesa
|
AZ
|
0
|
$400,000
|
Energy
|
3
|
|
Fire Station #215 (Phoenix-Mesa Gateway)
|
Mesa
|
AZ
|
0
|
$7,900,000
|
Public Safety
|
6
|
|
Fire Station #318
|
Mesa
|
AZ
|
0
|
$4,400,000
|
Public Safety
|
9
|
|
Fire Station #219
|
Mesa
|
AZ
|
0
|
$4,400,000
|
Public Safety
|
7
|
|
Security Site Hardening at Various City Buildings
|
Mesa
|
AZ
|
0
|
$400,000
|
Public Safety
|
-2
|
|
Central Mesa - Light Rail 3.5 miles of construction and utility relocations extending LRT through downtown Mesa to Horne Avenue
|
Mesa
|
AZ
|
0
|
$290,000,000
|
Transit
|
-45
|
|
Central Phoenix/East Valley LRT - Park-and-Ride Expansion
|
Mesa
|
AZ
|
0
|
$60,000,000
|
Transit
|
-2
|
|
Central Phoenix/East Valley LRT - Park-and-Ride Shade Canopies
|
Mesa
|
AZ
|
0
|
$20,000,000
|
Transit
|
-2
|
|
Central Phoenix/East Valley LRT - System Enhancements
|
Mesa
|
AZ
|
0
|
$20,000,000
|
Transit
|
1
|
|
Park and Ride; Gilbert Road and Red Mountain Freeway (Loop 202)
|
Mesa
|
AZ
|
0
|
$2,500,000
|
Transit
|
-1
|
|
Downtown Circulator Fleet Replacement
|
Mesa
|
AZ
|
0
|
$2,000,000
|
Transit
|
-1
|
|
Park and Ride; Power Road and Red Mountain Freeway (Loop 202)
|
Mesa
|
AZ
|
0
|
| | | | | | | |